This blog post shows the Crestron RL Lync Room system being installed.

The installation took approximately 4 hours to complete.

We positioned the centre of mounting bracket 133cm from ground.

From the centre point between the two screens each mounting bracket centre point was positioned 74.5cm from middle point of two screens.

Crestron RL Installation 1

Room before system was fitted

Crestron RL Installation 2

Codec with side rails attached

Crestron RL Installation 3

Codec with cable tidy attached – note we took this off as it was too obstructive

Crestron RL Installation 4

Frame which holds the codec

Crestron RL Installation 5

Codec on frame – it hangs on the frame and can move left to right

Crestron RL Installation 6

Wall frame at the bottom – codec attached to frame and bracket which attaches to screen on top of the codec

Crestron RL Installation 7

Mounting frame attached to TV screen

Crestron RL Installation 8

Height adjustment of screen is done by this bracket

Crestron RL Installation 9

Right hand screen wall mount in position with accessory bracket mounted to immediate right

Crestron RL Installation 10

Both wall brackets in position; Note the codec hanging on the right hand bracket

Crestron RL Installation 11

Screens in place

Crestron RL Installation 12

Cables running through trunking

Crestron RL Installation 13

Crestron RL Installation 14

Ready for use

Crestron RL Installation 15

The finished installation

Crestron RL Installation 16

Ready for a meeting